ConocoPhillips
Fabrication of Alaskan Pipeline Bridges and Substructure including Ice Breaker Pier Foundations, Abutment Pile Caps and Piling, and Superstructure for 3 Pipeline Bridges with Spans of 455 feet, 600 feet and 690 feet. Special requirements included AISC Fracture Critical QA requirements, low temperature steel with V-Notch Charpy Testing and spray metallizing of substructure. Total weight 1,820 tons.